{"id":14099,"date":"2026-08-26T12:56:10","date_gmt":"2026-08-26T09:56:10","guid":{"rendered":"https:\/\/klaipedon.lt\/?post_type=ka_veikti&#038;p=14099"},"modified":"2026-10-08T08:28:11","modified_gmt":"2026-10-08T05:28:11","slug":"tours-of-the-gren-klaipeda-power-plant","status":"publish","type":"ka_veikti","link":"https:\/\/klaipedon.lt\/en\/things-to-do\/tours-of-the-gren-klaipeda-power-plant\/","title":{"rendered":"Tours of the \u201cGren Klaip\u0117da\u201d power plant"},"content":{"rendered":"\n<p>Join a tour of the \u201cGren Klaip\u0117da\u201d power plant and get a close-up look at energy production from waste.<\/p><br><p>Since 2013, UAB Gren Klaip\u0117da has been producing heat and electricity from non-hazardous municipal and industrial waste that can no longer be recycled. It is the first plant of its kind in Lithuania and the Baltic States, contributing to the development of the circular economy.<\/p><br><p>During the tour, you will see the plant&#8217;s grounds and the main energy production facilities. You will visit the waste reception and bunker hall, where special cranes move the waste into the boiler. You will learn how the steam needed to produce energy is generated during the combustion process. You will also learn about slag treatment and the separation of metals for reuse and see the modern flue gas cleaning system and the control centre, where processes are monitored in real time.<\/p><br><p>The tours are designed for residents and visitors interested in sustainability and energy.<\/p><br><p>Tours are free of charge, held in Lithuanian or English and last 1\u20131.5 hours; groups of 15\u201320 people can take part.<\/p><br><p>Registration in advance by email at info.klaipeda@gren.com is required. In your email, please state your preferred date and time of arrival and the number of participants. Visits are only possible after confirmation by email.<\/p><br><p><strong>Virtual tour:<\/strong> if you cannot come in person, you are welcome to visit virtually: <a href=\"https:\/\/virtualtour.gren.com\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/virtualtour.gren.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Join a tour of the \u201cGren Klaip\u0117da\u201d power plant and get a close-up look at energy production from waste. Since 2013, UAB Gren Klaip\u0117da has been producing heat and electricity from non-hazardous municipal and industrial waste that can no longer be recycled. It is the first plant of its kind in Lithuania and the Baltic [&hellip;]<\/p>\n","protected":false},"featured_media":14623,"template":"","auditorija":[537,538,536,535],"veiklos_tipas":[626],"veiklu_lokacijos":[],"class_list":["post-14099","ka_veikti","type-ka_veikti","status-publish","has-post-thumbnail","hentry","auditorija-adults-en","auditorija-children-en","auditorija-seniors-en","auditorija-youth-en","veiklos_tipas-tours-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/ka_veikti\/14099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/ka_veikti"}],"about":[{"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/types\/ka_veikti"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/media\/14623"}],"wp:attachment":[{"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/media?parent=14099"}],"wp:term":[{"taxonomy":"auditorija","embeddable":true,"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/auditorija?post=14099"},{"taxonomy":"veiklos_tipas","embeddable":true,"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/veiklos_tipas?post=14099"},{"taxonomy":"veiklu_lokacijos","embeddable":true,"href":"https:\/\/klaipedon.lt\/en\/wp-json\/wp\/v2\/veiklu_lokacijos?post=14099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}